For requests or information,
please use the following form:
Projects
The community
Modernization of the Fair in General Scărișoreanu (project under development). The aim of the project, which fully respects the concept of sustainable development of a company, is to restore the fair in the locality of Constanța, General Scărișoreanu.
The largest agri-food fair in Constanța County, which has been operating for 20 years and which is visited weekly by thousands of people, has entered, through ADDJC, an extensive modernization program to align with European standards. in which such a location must operate.
Fishing infrastructure
ADDJC Constanța, together with CJ Constanța and several town halls in the county, is developing a large project, with European funding, on fishing ports, ie landing points on the Black Sea and the Danube.
The project is essential for Constanța County, given that in this area, commercial fishing, especially small-scale fishing, is a daily activity for a significant part of the population.
At present, in terms of small-scale fishing infrastructure, for both Black Sea and Danube fisheries, there is no EU-organized fishing port.
In this sense, ADDJC Constanța, in partnership with the local authorities, evaluated over 90 locations in the county, where fishing ports can be built or modernized. Technical studies have shown that seven such locations are eligible for European funding. ADDJC Constanța has already prepared the projects, worth over 30 million euros, to be submitted by the authorities, to receive funding. These are three fishing ports on the Black Sea (Constanța, Costinești and Năvodari) and four fishing ports on the Danube (Hârșova, Cernavodă, Oltina and Ghindărești).
Education
One sustainable development project in which the ADDJC has been involved with local authorities is the development of dual education. Started in the fall of 2021, the project is carried out by the Association for Sustainable Development of Constanța County in partnership with UMEX and the Alliance for Dual and consists in setting up a class of this type, at the High School „I.N. Romanian".
The project will be developed in the next period, by setting up three technical centers: one dedicated to the hotel / hospitality industry, one dedicated to creative trades (photography, design, cinematography, etc.) and one for general engineering (agricultural mechanics, welders, drills, etc.).
Consulting
At the initiative of the president of the Constanța County Council, Mr. Mihai Lupu, a working group was set up at the level of the Sustainable Development Association of Constanța County, in which the county ATUs receive specialized technical and economic support to implement projects on access to the national gas network. The extension and modernization of the gas networks is essential in the implementation of the Sustainable Development Strategy of Constanța County.
Road infrastructure
Among the projects written and submitted by ADDJC, in partnership with local authorities, are eight from the National Investment Program "Anghel Saligny". Their value is about 400 million lei and translates into the modernization of 100 kilometers of county road. The importance of such investments in the modernization of road infrastructure is essential in the perspective of the sustainable development of a society.
The eight road infrastructure projects:
1. Modernization of DJ 223B, section from Ivrinezu Mic to the intersection with DJ 223. The road section has a length of over 7 km, and the value of the project is 29.5 million lei.
2. Modernization of DJ224, section from the intersection with DC 63 to Băltăgești. The road section has a length of 5.2 km, and the value of the project is over 22.3 million lei.
3. Modernization of DJ 225, section from Nicolae Bălcescu to Târgușor. The section of road proposed for modernization has a length of 8.55 km, and the value of the project is
over 34.4 million lei.
4. Modernization of DJ 381, section from Potârnichea to the intersection with DJ 308. The road section has a length of approximately 11 km, and the value of the project is 47 million lei.
5. Modernization of DJ 391, section from Tuzla to Biruința. The road section has a length of 11.7 km, and the value of the project is 47.46 million lei.
6. Modernization of DJ 391, section from Viroaga / DJ 391A to the intersection with DJ 392. The road section has a length of 9.5 km, and the value of the project is 41.57 million lei.
7. Modernization of DJ 392, section from Amzacea to Vânători and extension of Vânători to the intersection with DN39C. The road section has a length of 17.42 km, and the value
the project is over 75.3 million lei.
8. Modernization of DJ 393, section from Techirghiol to Arsa. The road section has a length of 23.65 km, and the value of the project is approximately 89 million lei.
Tourism
Digitization of the tourism promotion system of Constanța (project under development).
Dezvoltarea unui centru virtual de promovare și informare turistică, accesibil tuturor turiștilor, dar și celorlalți cetățeni, prin care să le fie furnizate acestora informații actualizate în timp util referitoare la: disponibilitatea locurilor de cazare, restaurante, locuri de agrement, trasee turistice, stații de alimentare cu carburant/energie, asistență medicală, locuri de joacă pentru copii, obiective turistice, obiective religioase, precum și legătura directă cu instituțiile care se ocupă de siguranța publică.